Donate using PayPal

Cycling in Cotgrave

The local group for this area has not added any information yet - come back soon!

Other areas …

Latest photos of the area

See also a full list of photos in this area.

@RantyHighwayman Can't help but wonder if making these old filters more accessible for active travel would make them more useful for emergency services rather than them ending up being obstructed by parking? https://t.co/VnM0fmd91w

Velo Verde cycle café, Screveton

Absurd barriers have been relocated and painted becoming obstructive barriers in the process

Freshly installed (March 2021) dropped kerb linking the new shared path towards the Sharphill Development unfortunately gaining a very obstructive barrier :(

Standard obstructive barriers along the Grantham Canal, plus additional desire path to the right, complete with bollard.

Path environment where it splits into two for district centre access

Standard obstructive barriers along the Grantham Canal

Desire path through the hedge providing a missing link between two paths,

Desire path through the hedge bypassing the adjacent barriers

Standard obstructive barriers along the Grantham Canal

Bridge over the canal

Limited headroom, width, and steps under the A6011.

Very narrow path between the two crossing points inside the central reservation

Narrow paths either side of the A6011 crossing on a curve in the road, no markings to indicate people are crossing on this busy road

Standard obstructive barriers along the Grantham Canal

Gate across the Grantham Canal Towpath

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Wide, shallow gradient, smooth approach ramp to the A46 crossing

Bridleway Crossing of the A46

Narrow and low under bridge

Standard obstructive barriers along the Grantham Canal

Gate along the Grantham Canal Towpath

Standard obstructive barriers along the Grantham Canal

Obstructive barriers along the Grantham Canal

Gate across the Grantham Canal Towpath

Standard obstructive barriers along the Grantham Canal

Obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Slightly different obstructive barrier along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Different type of obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal, and also a Toucan Crossing ahead.

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Tight squeeze through the A Frame Barriers

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal (gate is usual closed, but as this is an access route to a dwelling it can occasionally be open)

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Standard obstructive barriers along the Grantham Canal

Barriers obstructing access to Cotgrave Greenway (note, only the access ramp is surfaced)

Implicit zebra across an access road

Barriers obstructing the tram side cycle route

Barriers obstructing the tram side cycle track

Obstructive barriers on the tram-side path, modified within weeks of construction as they were preventing access by people using non-standard bikes

Obstructive barriers on cycle track between Emmanual School and Gresham Sports Ground

Obstructive Barriers next to Emmanual School on the cycle track

Metal Bridge over the Grantham Canal

Short cycle lane into a traffic light.

Staggered barriers between Rugby Road and path

Barriers adjacent to tram side path

Barriers approaching the tramside path

Widened bridge over the watercourse

Cyclists Dismount leaving the cycle path entering the Rushcliffe Arena Car Park

Widely spaced barriers joining Collington Way

Widely spaced staggered barriers on cycle track between Northwold Ave and Collington Way

Obstructive barriers along the Grantham Canal

Tight barriers on the Grantham Canal

Tight barriers on the Grantham Canal

Absurd barriers on the footway

Absurd barriers on the footway half of the path!

Multiple barriers / bollards at bottom of Gertrude Road

Chicane barriers are easily bypassed

Proposed barrier near Ruddington Lane tram stop

Proposed barrier near Compton Acres tram stop

Proposed location of staggered barriers

City Card secure cycle parking in West Bridgford.

Recently installed Cycle Lanes on Melton Road - post in on pavement cycle path (which links to the Toucan used by east-west traffic crossing Melton Road) is presumably going to be signing the start of one cycle route by obstructing another ... [more]

Recently installed Toucan crossing making the crossing of Loughborough Road much safer.

Unnecessary conflict-causing barriers (the second of two pairs) here - wide enough apart they totally fail to stop mopeds, close enough together they make it difficult for cyclists towing a child-trailer to pass. A bollard or two would suf ... [more]

Newly widened path to the right of the fork. To the left the handrails have recently been installed as part of the Arena redevelopment, needed for walkers but an obstruction for cyclists - especially as the path to the left will be Route 5 ... [more]

While the replacement of the previous chicane here with a simple bollard is very welcome, being located in the shadows with no street lighting doesn't make this bollard very visible - especially bad heading from Beedling and turning right a ... [more]

Previous narrow bridge has been replaced with a much wider one.

The previous awkward barriers on this path have been replaced with a simple bollard. :) Shame the one lamp post left on the path (due to lack of space) is so close to the bollard making a nasty pinch point right at a point where pedestrian ... [more]

Recently widened path has also seen the lamposts moved back out of the path itself, and not only that they have been set back enough to actually make that useful. The increased number of streetlights should also improve visibility in the w ... [more]

Route 5 will go left here - forward visibility is poor here due to substation fence on the left and overgrowing plants on both sides (causing oncoming cyclists to be in the middle of the road). Requires maintenance to be kept on top of - u ... [more]

Future Route 5's crossing of the busy Compton Acres . Road markings and surface in a poor condition, no signs on the road that a cycle route crosses here. Visibility of speed traffic is very poor due to curvature of the road (traffic trave ... [more]

Newly laid dropped kerb which has been laid flush with both sides for a change! To be part of Route 5.

Recently resurfaced and widened cycle path from Tram Stop to Lymn Park - to be part of Route 5.

Recently widened path between Compton Acres tram stop and Ascott Garden - Route 5 bears left here. Behind the sign the path is a split level path, and this is the only path in West Bridgford where the cycle track is the higher side - guara ... [more]

Some obvious brain fade went on at this part of the cycle route - the path doesn't line up with itself, tight 90 degree bends, pedestrian only crossing, tram tracks on the desire line.... If any thought had been put into this you could hav ... [more]

Cycle racks at Wilford Lane tram stop.

Good job chaps, you've built a tram stop bypass so passengers and passing cyclists don't get in one another's way. Wait what, that's not allowed - we need to install a conflict-causing barrier quick sharp! Grr, one of the few tram stops w ... [more]

A couple of years on from #65099 , path now fully surfaced and fencing removed. As per previous photo you want to go right here...

Barriers removed from the southern cycle corridor near the Beckett School - still showing the scars caused by the obstruction months later!

Signage on NCN15 where it leaves Holme Road and enters The Hook.

Go to the right at this fork in the path you will struggle to get through the gate on the left path. They bring you out fifty metres apart on the road up ahead not worth bothering with the hassle of the left route.

A pain of a gate. Struggled to get through with a single wheel trailer

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://cotgrave.cyclestreets.net/area/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.